DOD Base Structure Reports (Nevada)

Comments compare the present year to the previous year.
dod base structure 2008

Tonopah Afs Z164 now leaves the database.
Nellis AFB number of buildings now reduced by 7. Decrease of  98907 square feet.
Creech AFB gains two buildings. Increase of  12013 square feet.


base struction dod 2007Tonopah Auxillary Airfield Annex loses one building.  Decrease of 1620 square feet.
Indian Springs AF Auxillary now renamed Creech Air Force Base. Creech gains 3 buildings. Increase of 94760 square feet.
Nellis AFB loses 1121 buildings. Decrease of 1439212 square feet.
A new facility called Tonopah Afs Z164 appears.
base struction 2006 dod

Nellis gains one building. Decrease is 50521 square feet. 
Indian Springs gains 2 buildings. Increase is 1584 square feet.


TTR Auxiliary Airfield Annex #1 gains one building. Increase is  5233 square feet.
TTR Auxiliary Airfield Annex #2 loses one building. Decrease is  625 square feet.
Nellis AFB gains 112 buildings. Increase is 324659 square feet.
Nellis Range gains 5 buildings. Increase is 2062 square feet.
Indian Springs gains 8 buildings. Increase is 28418 square feet.

There doesn't appear to be any major changes at the Tonopah Test Range, so perhaps the reduction in 19 buildings from the previous year reflects a transfer to the Department of Energy.


The number of buildings at Indian Springs increased from 75 to 83 between September 2001 and September 2002. The square footage went from 209653 to 311318, yielding an increase of 101665 square ft. This increase may be related to the Predator UAV program.

In 2001, there was a line item "Tonopah AFS", which no longer appears in the 2002 report.


Breakdown of other sites: Army (15), Navy (3), Air Force (23), USMC (0)

The phone number for the Tonopah Auxilliary Airfield Annex #2 is actually the phone number for

COUNTY MANAGER
Jerry McKnight
P. O. Box 153
Tonopah, NV 89049
(775) 482-8191
Fax (775) 482-8198

The remaining phone numbers are legitimate.

Between 1999 and 2000, Indian Springs went from 77 buildings to 75 buildings, but added 8168 square feet. This may be related to the new buildings built for the Predator operations.